Downloading 1.90MB - Kindly twindle ur thumbs.
     
  Job 1343 - Before and After
    100mm x 65mm Sewer Junction Back to Job Profile Index
CCTV inspection revealed a broken 100mm x 65mm junction beneath a new ensuite bathroom floor. The 65mm branch pipe received waste water from an adjacent laundry.

Manufactured and installed junction liner into position from three access and pull points.

Successfully sealed all broken sections of pipeline and prevented water egress from undermining the ensuite bathroom floor

This process prevented the customer from expensive excavation and remedial work.
Go to top
 
  Copyright © SA PIPE RELINING  ::  Sitemap Web Designed and Developed NORBAC DIGITAL MEDIA